BPC Building Audits and Inspections: Why Fire Safety Documentation Matters

Fire safety compliance is not just about what can be seen when a building is finished.

Behind every compliant building should be a clear trail of design decisions, engineering, approvals, inspections, supporting evidence and records that show how the work was assessed and constructed.

With the Building and Plumbing Commission (BPC) continuing its documentation audits and risk-based inspection activities across Victoria, this is a good time for builders, engineers, plumbers, sprinkler fitters and other practitioners to look closely at both their work and their paperwork.

Start With the First Principles of Building Surveying

Most people never think about why buildings feel familiar.

We expect door handles to be at practical heights. We expect stairs, handrails, exits and hallways to work in predictable ways. We expect doors to open correctly and, most importantly, we expect fire protection systems to perform when they are needed.

Those outcomes do not happen by accident.

Behind them is a process involving:

  • Design
  • Engineering
  • Planning approvals and relevant authorities
  • Building permit assessment
  • Construction and supervision
  • Inspections
  • Documentation
  • Final approval and sign-off

The public generally sees only the finished building. The regulatory and construction process that produced it remains mostly invisible.

That is exactly why documentation matters.

The BPC’s Building Surveyors Code of Conduct was prepared under section 177A(1)(a) of the Building Act 1993. Among other requirements, the Code expects building surveyors to act lawfully and in the public interest, perform their work competently and maintain appropriate records supporting their decisions.

Principle 6 is particularly relevant: building surveyors must document and maintain relevant information, including the evidence and reasoning supporting their decisions.

In practical terms, the questions are simple:

What was approved? Who checked it? What evidence was relied on? And can that evidence still be found when someone asks for it?

The current Building Regulations also prescribe the work that registered building surveyors are authorised to perform under their class of registration.

The Shade Sail Lesson

A few years ago, I decided to install a shade sail on a rural property for Christmas.

I bought a 10 m × 10 m shade sail, brought out our 100 HP New Holland backhoe, dug four deep holes and installed four large steel posts.

After two days of work, the shade sail was up.

It looked great.

The kids loved it.

Then the wind arrived.

What I had not properly allowed for was the live load created by the wind acting on a very large sail.

The forces bent the steel poles, pulled the chain connection apart and eventually required the New Holland and its 7 m boom to bring the entire sail safely back to the ground.

Fortunately, no one was injured.

But the lesson was obvious.

Without engineering, design, approvals and the experience to understand the loads involved, I had no reliable way of knowing whether what I had built was suitable.

Today, that project looks very different. We went through the proper process and are building a substantial carport with engineering, approvals and the paperwork to support it.

What Does This Have to Do With Fire Safety?

Everything.

A fire protection system can look perfectly acceptable from the outside while important details remain unresolved behind walls, above ceilings or inside service risers.

The same principle applies:

You cannot rely only on how something looks. You need evidence that it was designed, installed and checked correctly.

This becomes particularly important when services penetrate fire-resistant or smoke-resistant construction.

Pipes, ducts, cables and other services may need to pass through fire-rated walls and floors. The protection method for those penetrations needs to be properly documented so that the design demonstrates how the required fire performance will be maintained.

The BPC has specifically highlighted inadequate documentation of service penetrations as an issue identified through building documentation audits.

Once those services are concealed behind walls or ceilings, verifying and correcting the work can become significantly more difficult and expensive.

What Is the Building Documentation Audit Program?

The BPC’s Building Documentation Audit Program, or BDAP, reviews building documentation to check whether regulatory requirements are being met.

These are desktop audits that can look at administrative and technical documentation associated with building work.

For technical audits, the BPC considers matters such as:

  • whether the relevant NCC provisions have been identified
  • whether enough documentation exists to assess compliance
  • whether the proposed solution is Deemed-to-Satisfy, a Performance Solution or a combination
  • whether the documentation actually demonstrates compliance

Sites and practitioners can be selected using risk factors, building permit information and other intelligence.

The lesson for industry is straightforward:

If compliance depends on a document, calculation, drawing, test report or certificate, make sure it exists, make sure it is correct and make sure it can be found.

What About Site Inspections?

Documentation audits are only part of the picture.

The BPC also carries out inspections using a risk-based approach. Current BPC guidance says site selection can draw on building permit data, compliance information, consumer reports, statutory referrals, strategic priorities and other intelligence.

The Building Regulations also explain that the relevant building surveyor is involved through the building process, including mandatory inspection stages. The RBS may inspect work personally or arrange for an appropriately registered or prescribed person to conduct the inspection, and enforcement action is required where non-compliant work is identified.

The important distinction is this:

Paperwork should show what was supposed to be built. Inspection helps establish what was actually built.

The two should match.

What Should Contractors Have Ready?

If you are an engineer, builder, plumber, sprinkler fitter or another practitioner involved in the work, make sure you can identify and produce the information relevant to your scope.

Depending on the project, this may include:

  • Building surveyor-approved and stamped drawings
  • Current approved construction drawings
  • Engineering calculations
  • Product information and technical data
  • Certificates and test reports
  • Approved materials
  • Installation details
  • Site instructions
  • Photographs taken before work is concealed
  • Inspection records
  • Materials lists and take-offs
  • Details of who carried out the work
  • Records of variations and approvals
  • Evidence that identified defects were rectified

Do not rely on someone being able to reconstruct the history of the job months later.

Record it while the work is happening.

Check Fire Safety Work Before It Is Covered Up

Fire-resistant walls, ceilings and service penetrations deserve particular attention.

Ask the questions while the work is still visible:

  • Does the installation match the approved drawings?
  • Are the specified products actually being used?
  • Are service penetrations properly detailed?
  • Is the installation consistent with the tested or assessed system?
  • Have photographs been taken?
  • Are certificates, reports and product documents available?
  • Has any variation been properly reviewed and approved?

If there is a problem, this is the time to find it.

Once walls and ceilings are closed and finishes are complete, the cost and disruption involved in investigating the same issue can increase dramatically.

What Should You Do Now?

Do not wait for an audit or inspector to identify a problem.

If you have projects underway, review the basics now:

  1. Confirm that the latest approved drawings and fire safety documentation are available.
  2. Check that installed work matches the approved documentation.
  3. Inspect passive and active fire safety work before it becomes concealed.
  4. Photograph critical installations while they remain visible.
  5. Record variations, instructions and rectification work.
  6. Make sure certificates and supporting evidence relate to the work actually completed.
  7. Resolve discrepancies as they arise instead of leaving them until project completion.

The Point

Compliance is not created by paperwork alone.

And it is not established simply because finished work looks correct.

Good outcomes come from the combination of proper design, engineering, approvals, competent installation, inspection and records that show how compliance was achieved.

Do the paperwork. Check the work. Record the evidence. Then check it again before it gets covered up.

That process protects the practitioner, the building owner and, ultimately, the people who will use the building.

Need Help With a Fire Protection Issue?

If you need assistance reviewing fire protection systems, investigating existing conditions or resolving fire system issues before they become more difficult to address, contact Melfire on 1300 134 971.